How Much Wastage to Add

Every material wastes a little — to cuts, breakage and just getting the job done. Here are sensible buffers by material.

Advertisement

Why Wastage Matters

Ordering exactly what the math says means you'll run out. Adding a buffer is the difference between one finished job and a second trip to the supplier.

Recommended Percentages

MaterialTypical Wastage
Concrete (slabs)5-10%
Concrete (complex forms)10-15%
Tile (straight)5-8%
Tile (diagonal/pattern)10-15%
Lumber / decking10%
Bricks / blocks5-10%
Paint10-15%
Roofing shingles10%

Square vs Pattern Waste

Layout drives waste as much as material. Straight-laid flooring and tile waste far less than herringbone, diagonal or heavily cut work.

Round Up at the Register

Apply your percentage, then always round up to the next whole bag, bundle, carton or yard. A small surplus you can return beats a deficit that stops the job.