Build the Form

  1. Set the perimeter

    Stake and brace 2x4 or 2x6 forms to your finished slab dimensions.

  2. Level and square

    Check the top edges are level and the corners are square.

  3. Set the gravel and vapor barrier

    Account for base and barrier choices before pour day.

Reinforce

A grid of rebar or welded wire mesh keeps the slab from cracking. Lay it raised off the ground and tied at the intersections so it sits centered in the slab thickness.

Estimate and Order the Concrete

Cubic yards = (length × width × thickness) ÷ 27

Add wastage then order bags or ready-mix. Have help and tools staged before the truck or mixer arrives — concrete sets on your schedule, not the calendar's.

Pour and Finish

  1. Screed

    Pull the surface flat along the forms.

  2. Float

    Work out to a smooth, level surface as bleed water comes up.

  3. Trowel and edge

    Finish with a steel trowel and round the edges.

  4. Cut control joints

    Score joints early to control future cracking.

Cure

Keep fresh concrete damp for several days — cover it with plastic or wet it down. Curing concrete that dries too fast is weaker and more likely to crack.